Energy Projects
Don't estimate the saving. Measure it.
Projects that claim savings without post-intervention measurement stay in the estimate category. Verified avoided energy use requires a defensible sequence.
Baseline → Intervention → Post-Intervention Measurement → Verified Avoided Energy Use → Proof of Conservation
- Baseline before the intervention
- Clear intervention boundary and records
- Post-intervention measurement under comparable conditions
- Verified avoided energy use, not modelled hope
- Pathway to Proof of Conservation when requirements are met
Internal champions
Help colleagues approve the next step without rewriting the case from scratch.