Asset Owners
Your buildings are consuming your returns.
Operating cost, asset performance, NOI, and capital allocation all improve when wasted energy becomes visible, and when conservation can be measured rather than claimed.
Rank assets by waste intensity → prioritise measurement → roll up verified MWh
- Rank assets by waste intensity before CapEx decisions
- Prioritise measurement where plant loads dominate opex
- Roll up measured and verified MWh across the portfolio
- NOI protection through lower avoidable energy intensity
- A clear commercial ladder from screening to measurement studies
Life-cycle view
Avoid icebergs: procurement is not the whole cost
CapEx is visible. Energy, maintenance, and performance drift sit below the waterline for decades.
waterline
Procurement costs
What the bid shows
Life-cycle costs
Energy, maintenance, downtime, carbon, and re-procurement
Conceptual. Measurement makes the submerged cost visible before you commit capital.
Illustrative economics only
What a plant efficiency step-change can look like
Example model inputs and outputs for a large cooling plant retrofit. Not an offer. Not a guarantee. Tariff, load, and CAPEX vary by site.
Pre-retrofit plant
1.03 kW/RT
Illustrative baseline
Post-retrofit plant
0.61 kW/RT
Illustrative optimised
Annual energy reduction
~5.5 GWh
At stated cooling load
Annual cost savings
~USD 0.74m
At illustrative blended tariff
Project CAPEX
~USD 2.2m
Illustrative total
Simple payback (funder view)
~3.7 yr
Illustrative structure
Drawn from structured plant-performance financing models used in industry presentations. Negawatts.io will size every project from site data. DIFY field work is typically considered when indicative annual conservation value is SGD 50,000 or more.
Singapore · featured market
Installed capacity often exceeds real cooling load
Many commercial plants are oversized relative to peak and average load. That gap is where measurement and optimisation find waste.
Conceptual chart inspired by published Singapore building stock patterns (e.g. NEA-type analyses). Not a plot of named buildings. Use site measurement for project decisions.
Internal champions
Help colleagues approve the next step without rewriting the case from scratch.
