Facility & Energy Managers

What's actually happening in your plant room?

Temporary instrumentation establishes how the plant performs under real operating conditions: power, flow, temperatures, load, and kW/RT.

POWER + FLOW + TEMPERATURE → COOLING OUTPUT → kW/RT

  • Central cooling plant and chiller focus first
  • Continuous logging, not a single spot reading
  • Engineering variables you already know: power, flow, Tₛ, Tᵣ
  • Findings you can act on with controls and operations
  • Partner-delivered installation under Negawatt measurement protocols

From SGD 4,950, subject to site suitability

Cooling plant · CH-1 · illustrative

Full studies log ~4 weeks continuously

Measured performance

1.38kW/RT

Target performance

0.58kW/RT

at 8.5°C

Performance gap

Illustrative conservation opportunity vs target specific power

58%

MEASURED1.38
TARGET · at 8.5°C0.58

Instrumentation variables

P

Electrical power

kW

Cooling load

RT

Chilled water flow

L/s

Tₛ

Supply temperature

°C

Tᵣ

Return temperature

°C

SP

Specific power

kW/RT

System boundary · schematic

Illustrative example. Platform target is 0.58 kW/RT at 8.5°C supply condition: a performance benchmark, not a measured post-intervention result unless verified on site.

What happens on site

  1. 01

    Survey

    Site suitability, plant access, and measurement boundary

  2. 02

    Install

    Temporary instrumentation via approved field partners

  3. 03

    28-day log

    Continuous data under real operating conditions

  4. 04

    Remove & report

    Equipment out; kW/RT analysis and findings delivered

Singapore · featured market

Installed capacity often exceeds real cooling load

Many commercial plants are oversized relative to peak and average load. That gap is where measurement and optimisation find waste.

Installed capacity (relative) Cooling load (relative)

Conceptual chart inspired by published Singapore building stock patterns (e.g. NEA-type analyses). Not a plot of named buildings. Use site measurement for project decisions.