Negawatts.io
SolutionsMeasureVerifyProductsCasesPartnersResearchAbout
Negawatts.io

Measurement · Conservation · Evidence

Find your Negawatts.

Measure real plant performance, cut unnecessary load, and verify conservation under operating conditions.

Built for portfolios and central plant-heavy assets. Featured locations: Sydney and Singapore. Representative offices: Perth, Brisbane, and Townsville.

How much energy is your building wasting?

Get your free Negawatt estimate

For a desktop performance estimate, attach three months of operators log sheets. Form-only results stay rough and indicative, not verified conservation.

Cooling plant · CH-1 · illustrative

Full studies log ~4 weeks continuously

Measured performance

1.38kW/RT

Target performance

0.58kW/RT

at 8.5°C

Performance gap

Illustrative conservation opportunity vs target specific power

58%

MEASURED1.38
TARGET · at 8.5°C0.58

Instrumentation variables

P

Electrical power

kW

Cooling load

RT

Chilled water flow

L/s

Tₛ

Supply temperature

°C

Tᵣ

Return temperature

°C

SP

Specific power

kW/RT

System boundary · schematic

Illustrative example. Platform target is 0.58 kW/RT at 8.5°C supply condition: a performance benchmark, not a measured post-intervention result unless verified on site.

What happens on site

  1. 01

    Survey

    Site suitability, plant access, and measurement boundary

  2. 02

    Install

    Temporary instrumentation via approved field partners

  3. 03

    28-day log

    Continuous data under real operating conditions

  4. 04

    Remove & report

    Equipment out; kW/RT analysis and findings delivered

Team project experience · Singapore & Korea · not Protocol issuance

Full case study →

0.75 → <0.60

kW/RT · mixed-use chiller plant optimisation (SG)

~SG$26k/yr

AHU fan example · 106,800 kWh/yr @ 24 c/kWh (indicative)

40%+

Design-led efficiency vs baseline · wafer fab newbuild (SG)

From measured plant performance toward defensible conservation evidence, not offsets. For sustainability teams →

Portfolio loop: rank assets by waste intensity → prioritise measurement → roll up verified MWh. For portfolios →

How you work with us

To enable your journey, no matter how big or small

Every organisation can start. DIY tools and DIWY specialist support carry smaller opportunities. DIFY field delivery is for when indicative annual conservation value reaches SGD 50,000 or more, so the path always matches the size of the prize.

Path sizing · DIFY value quantum

SGD 50,000/ year → field delivery

Below SGD 50,000: DIY and DIWY keep you moving. At or above: DIFY measurement is usually the right next step. Start free either way.

DIYEvery journey starts here

Self-serve

You run the tools.

Screening, early scoping, and smaller opportunities.

Start here for any size of site: free tools and low-cost certificates so every journey can begin.

DIWYEvery journey starts here

With specialists

You work with our team.

Assessments, hunts, baselines, and MRV planning with professional review.

Specialist support for smaller opportunities, and the bridge that prepares larger ones for field measurement.

DIFYSGD 50,000 · field

We deliver

Negawatts.io and, where appropriate, approved partners.

Field measurement, plant studies, and implementation. Delivery may be by Negawatts directly or via the partner network, depending on location, geography, scale, procurement, and capability. Own solutions such as vChill, vGrid, and vPool may apply.

When indicative annual conservation value reaches SGD 50,000 or more, full field delivery is the right path. Still sized to your plant, not a one-size study.

The SGD 50,000 figure is indicative annual conservation value (avoided energy cost at your tariff): a sizing guide so field work fits the opportunity. It does not block smaller sites: DIY and DIWY are built for them. A free estimate shows where you sit on the path. Full product catalogue →

Entry points

What are you trying to improve?

Choose the problem, not your job title.

01

My Building

Find operational energy waste.

02

My Portfolio

Identify underperforming assets.

03

My Sustainability Performance

Turn conservation into defensible evidence.

04

My Energy Project

Measure and verify an intervention.

Engineer, technology provider, instrumentation specialist, or researcher? Work with Negawatt →

Partner Panel · Research Partners · Negawatt Labs Network

Sydney · Singapore · Perth · Brisbane · Townsville

Energy not used is energy that still has to be measured.

Portfolios and central plant-heavy assets. Find the waste, measure the plant, verify the conservation.

Sequence

Find → Measure → Optimise → Verify → Conserve

Each stage increases evidentiary certainty. Start with a free calculator; progress to temporary instrumentation when the plant justifies it. Operations then run as a closed loop, not a straight line that ends at the report.

Commissioningaudit loop01Audit02Measure03Analyse04Optimise05Verify06Feedback
Commissioning · audit loop. The loop returns so learning and commissioning do not end at a single report.

Closed loops

Start with audit. Finish with audit. Keep learning.

Conservation is not a one-off report. Continuous commissioning, feedback, and learning cycles return to measurement so performance does not drift.

Commissioningplant loop01Audit02Measure03Analyse04Optimise05Verify06Feedback
Commissioning · plant loop. The loop returns so learning and commissioning do not end at a single report.

Continuous commissioning: audit opens and closes the loop so the plant is re-checked after every improvement.

Learningfeedback01Observe02Hypothesise03Intervene04Learn05Re-observe
Learning · feedback. The loop returns so learning and commissioning do not end at a single report.

Learning cycle: each intervention feeds the next observation, not a static baseline forever.

Evidencecertainty01Estimate02Measure03Verify04Prove05Improve
Evidence · certainty. The loop returns so learning and commissioning do not end at a single report.

Evidence cycle: estimate, measure, verify, prove, then improve and re-enter with higher certainty.

Plant performance

See the gap before you buy the badge

Typical plant intensity includes design, commissioning, controls, and maintenance. Optimised operation cuts the whole stack.

Where the kW/RT goes

Typical plant intensity includes design, commissioning gaps, controls, and maintenance. Optimised operation cuts the stack, not just one component.

Water side

Chillers + CHWPs + CWPs + CTs

Typical 1.30
Design
Cx
Controls
Typical
54%savings
<0.60
Operating avg

kW/RT · design baseline ≈ 0.85 shown in stack body

Air side

AHUs + FCUs

Typical 0.60
Design
Cx
Typical
58%savings
<0.25
Operating avg

kW/RT · design baseline ≈ 0.40 shown in stack body

Illustrative redraw from engineering practice (IDPM-style analysis). Percentages and levels are not a site guarantee. Align with measured plant data on each project.

Signature measurement

Don't estimate performance. Measure it.

We temporarily instrument cooling plant and establish the actual performance curve under real operating conditions.

P
Chiller electrical input (kW)
Chilled water volume flow
Tₛ / Tᵣ
Supply and return temperatures
Cooling output (RT)
SP
Specific power (kW/RT)
Duration
Continuous logging · ~4 weeks

From SGD 4,950 · subject to site suitability

Cooling plant · CH-1 · illustrative

Full studies log ~4 weeks continuously

Measured performance

1.38kW/RT

Target performance

0.58kW/RT

at 8.5°C

Performance gap

Illustrative conservation opportunity vs target specific power

58%

MEASURED1.38
TARGET · at 8.5°C0.58

Instrumentation variables

P

Electrical power

kW

Cooling load

RT

Chilled water flow

L/s

Tₛ

Supply temperature

°C

Tᵣ

Return temperature

°C

SP

Specific power

kW/RT

System boundary · schematic

Illustrative example. Platform target is 0.58 kW/RT at 8.5°C supply condition: a performance benchmark, not a measured post-intervention result unless verified on site.

What happens on site

  1. 01

    Survey

    Site suitability, plant access, and measurement boundary

  2. 02

    Install

    Temporary instrumentation via approved field partners

  3. 03

    28-day log

    Continuous data under real operating conditions

  4. 04

    Remove & report

    Equipment out; kW/RT analysis and findings delivered

Internal champions

You found us. Someone else may hold the budget.

Simple briefs to help a facility manager, sustainability lead, or asset manager obtain internal approval for assessment or measurement.

Start

How much energy is your building wasting?

Get your free Negawatt estimate

Attach three months of operators log sheets for a desktop plant estimate

Negawatts.io: Find your Negawatts