Internal champion tool · draft brief

Share with your CFO

Frame measurement and conservation as operating cost and capital discipline, not sustainability theatre.

Intended reader: Finance / CFO

Phase 1: on-page brief for copy/paste into email or deck. Downloadable PDF generation can follow in a later phase.

Suggested talking points

  1. Wasted energy is recurring opex that rarely appears as a named line item.
  2. Indicative screening is cheap; temporary plant measurement establishes real kW/RT performance.
  3. Target cooling plant performance of 0.58 kW/RT at 8.5°C is a benchmark to pursue, not a guaranteed after figure.
  4. Spend is staged: free calculator → low-cost assessments → measured studies from SGD 4,950 subject to site suitability.
  5. Verified avoided energy use (later) can support assurance; estimates alone should not.

The ask
Approve a portfolio scan or a single chiller performance study as a pilot with a clear evidence deliverable.

Contact: info@negawatts.io · +65 8060 0219

Life-cycle view

Avoid icebergs: procurement is not the whole cost

CapEx is visible. Energy, maintenance, and performance drift sit below the waterline for decades.

waterline

Procurement costs

What the bid shows

Life-cycle costs

Energy, maintenance, downtime, carbon, and re-procurement

Conceptual. Measurement makes the submerged cost visible before you commit capital.

Illustrative economics only

What a plant efficiency step-change can look like

Example model inputs and outputs for a large cooling plant retrofit. Not an offer. Not a guarantee. Tariff, load, and CAPEX vary by site.

Pre-retrofit plant

1.03 kW/RT

Illustrative baseline

Post-retrofit plant

0.61 kW/RT

Illustrative optimised

Annual energy reduction

~5.5 GWh

At stated cooling load

Annual cost savings

~USD 0.74m

At illustrative blended tariff

Project CAPEX

~USD 2.2m

Illustrative total

Simple payback (funder view)

~3.7 yr

Illustrative structure

Drawn from structured plant-performance financing models used in industry presentations. Negawatts.io will size every project from site data. DIFY field work is typically considered when indicative annual conservation value is SGD 50,000 or more.