Negawatts.io
SolutionsMeasureVerifyProductsCasesPartnersResearchAbout

Internal champion tool · draft brief

Brief My Facility Team

Explain what will be measured on site and why temporary instrumentation is not another desktop audit.

Intended reader: Facility & energy managers

Phase 1: on-page brief for copy/paste into email or deck. Downloadable PDF generation can follow in a later phase.

Suggested talking points

  1. Variables: electrical power, chilled water flow, supply/return temperatures, cooling load, operating hours.
  2. Duration: typically continuous logging over ~4 weeks for a full chiller study (or ~7 days for a snapshot).
  3. Output: measured kW/RT curve under real loads, plus findings suitable for controls and operations.
  4. Field install via approved measurement partners under Negawatt protocols.
  5. Illustrative: measured plant at 1.38 kW/RT vs target 0.58 kW/RT at 8.5°C. Target is not a measured after unless verified.

The ask
Identify candidate chillers/plant rooms and confirm site access for temporary metering.

Contact: info@negawatts.io · +65 8060 0219

Life-cycle view

Avoid icebergs: procurement is not the whole cost

CapEx is visible. Energy, maintenance, and performance drift sit below the waterline for decades.

waterline

Procurement costs

What the bid shows

Life-cycle costs

Energy, maintenance, downtime, carbon, and re-procurement

Conceptual. Measurement makes the submerged cost visible before you commit capital.

← Home

Brief My Facility Team · Negawatts.io