Owned solution · cooling plant

vChill

Central plant and chiller performance: establish how the system actually runs, improve operations, and re-measure so conservation is evidenced rather than estimated.

Negawatts.io is technology agnostic. Measurement, verification, and conservation pathways can work with customer systems and third-party technology. vChill is the named pathway for cooling plant work inside that broader platform.

MeasureOptimiseVerifyDIFY / DIWY

Cooling plant · CH-1 · illustrative

Full studies log ~4 weeks continuously

Measured performance

1.38kW/RT

Target performance

0.58kW/RT

at 8.5°C

Performance gap

Illustrative conservation opportunity vs target specific power

58%

MEASURED1.38
TARGET · at 8.5°C0.58

Instrumentation variables

P

Electrical power

kW

Cooling load

RT

Chilled water flow

L/s

Tₛ

Supply temperature

°C

Tᵣ

Return temperature

°C

SP

Specific power

kW/RT

System boundary · schematic

Illustrative example. Platform target is 0.58 kW/RT at 8.5°C supply condition: a performance benchmark, not a measured post-intervention result unless verified on site.

What happens on site

  1. 01

    Survey

    Site suitability, plant access, and measurement boundary

  2. 02

    Install

    Temporary instrumentation via approved field partners

  3. 03

    28-day log

    Continuous data under real operating conditions

  4. 04

    Remove & report

    Equipment out; kW/RT analysis and findings delivered

What vChill covers

From temporary measurement to operating discipline

01 Measure

Temporary instrumentation establishes kW/RT under real loads, typically over about four weeks of continuous logging.

02 Optimise

Operational and controls improvements guided by measured performance, not nameplate assumptions.

03 Verify

Re-measure after intervention. Build the evidence path toward Proof of Conservation where eligible.

Projects may be delivered by Negawatts.io directly, or through the approved partner network, depending on location, geography, scale, procurement rules, capability, and other factors. Field studies are typically considered when indicative annual conservation value is SGD 50,000 or more. Smaller opportunities start with DIY tools and DIWY support.

Plant performance gap

See intensity before you buy the badge

Typical plant intensity stacks design, commissioning, controls, and maintenance. Optimised operation reduces the whole stack.

Where the kW/RT goes

Typical plant intensity includes design, commissioning gaps, controls, and maintenance. Optimised operation cuts the stack, not just one component.

Water side

Chillers + CHWPs + CWPs + CTs

Typical 1.30
Design
Cx
Controls
Typical
54%savings
<0.60
Operating avg

kW/RT · design baseline ≈ 0.85 shown in stack body

Air side

AHUs + FCUs

Typical 0.60
Design
Cx
Typical
58%savings
<0.25
Operating avg

kW/RT · design baseline ≈ 0.40 shown in stack body

Illustrative redraw from engineering practice (IDPM-style analysis). Percentages and levels are not a site guarantee. Align with measured plant data on each project.